![]() ![]() The Intempo has almost 43,000 square feet of common areas, including an approximately 2,624-square-foot pool on the ground floor. Previously on Archinect: Intempo 47-Story Skyscraper Builders Forgot To Include Working Elevator In 2018, Intempo was acquired by SVP Global, which has managed the undertaking up to its current completion. At this point, the architects had stepped away from the project. There was also controversy regarding unsafe working conditions for the builders. ![]() The project later resumed and was almost completed in 2014 but was interrupted again by the bankruptcy of its developer. It was originally scheduled for completion in 2009, however, progress was halted due to the 2008 financial crisis, which had a huge impact on the real estate sector in Spain. Designed by architects Pérez-Guerras and Olcina & Radúan, the design of the building was officially presented in 2006 and work began in 2007. It seems like a miracle that Intempo has been fully realized. The towers are connected by a prominent cone-shaped structure, which houses the penthouse units. Its twin towers also feature Spain’s fastest elevator, which rises at a rate of about 13.8 feet per second, able to reach the top floor in 52 seconds, according to The Guardian. It is also one of the world’s tallest buildings in a city with fewer than 100,000 residents. The 47-story apartment building, consisting of 256 units, is now the tallest residential skyscraper in the European Union and the tallest of any type in Spain outside of Madrid. ![]() Following a 15-year construction period marred with setbacks, the approximately 650-foot, M-shaped Intempo skyscraper has been completed in the Spanish resort city of Benidorm. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |